Write from everyday work, not a feature list: three to seven scenes for version one, the exceptions, what you will not build yet, and a simple test before you ask for a quote.
When a software project overruns its first price or deadline, the programmer is usually the first to be blamed. Sometimes that is fair. Very often, though, the gap began earlier: the need stayed in the owner’s head, or it was written as a feature list or as “something like that well-known app,” instead of a description of everyday work. Two teams may then be pricing two different things, and only after building starts does it become clear that the first version was meant to include far more than was said in the first meeting.
This site already has a short one-page template: “How do we write a software project brief?” This article is not a repeat of that list of headings. It is about how to fill that page so the first version stays under control: write from real work, separate what the first version must do from what can wait, and name the exceptions that usually eat the schedule.
If you are still choosing between ready-made software and a custom build, start with “Should I buy ready-made software or build custom? The hidden costs of both, and a simple test for the decision.” What a price is made of is in “What makes up the cost of an app or a website? And why do two quotes differ so much?” Finding a trustworthy company is in “How do you find a trustworthy software company?” and the questions to ask before you sign are in “10 questions to ask before you order an app or software.” We do not repeat those here.
Every example is hypothetical and is only there to make the point clear. This is an educational article, not a contract template.
The overrun that starts with an unwritten need
In 2012, McKinsey and the University of Oxford’s BT Centre for Major Programme Management reviewed more than 5,400 IT projects whose initial budgets exceeded 15 million dollars. They reported that these large projects ran, on average, about 45 percent over budget and about 7 percent over time, and delivered about 56 percent less value than predicted. In the same research, software projects carried the highest risk of cost and schedule overruns. Every extra year in the planned duration increased cost overruns by about 15 percent.
Those figures describe very large projects, not a booking system for a small clinic or shop. There is no equivalent public study for small businesses in Iran, and we will not invent one. What is still useful is the pattern: when the need is not written down in a stable, clear way, and when the first version is planned as a long, all-at-once build, cost and time are more likely to slip. A smaller, clearer first version is one way to reduce that risk.
Do not start with a feature list
“I want an app like that famous one,” or a list of twenty features, is a weak place to start. The famous app is usually the result of years of work by a large team. Every word on a feature list also hides several smaller jobs. “Online payment,” for example, is not just a button. It usually means recording the amount, connecting to a payment provider, what happens if the customer cancels mid-way, a receipt, and what you do if there is not enough money or the provider does not respond. One team may have priced only the button; another may have priced all of those cases. Without a clear account of the work, comparing two quotes is almost meaningless.
The UK government’s design principles, written for that country’s public services and not a law in Iran, put this first: start with user needs. If you do not know what the user needs are, you will not build the right thing. The same text notes that what people ask for is not always what they need. In the UK service manual, the advice is to write the need around the user’s problem, not around a solution chosen in advance. Their own example is that “I need a reminder” is not the same as “I need an email or a letter.”
For the owner of a small business, the plain meaning is this: first write who, in the everyday work, needs to finish what — not “we must have an app” or “we must have artificial intelligence.”
Write a real working day
Imagine a small physiotherapy clinic that still books appointments by phone and messaging apps. The owner feels that “we need a booking app.” If the writing starts with that sentence, almost any team can propose almost anything.
Write a real morning instead. For example: a returning patient calls and wants a slot on Wednesday at five. The receptionist has to see that the hour is truly free, record the appointment and tell the patient when to come. That same day, another patient wants to move an appointment. One of the therapists is unwell, and their appointments have to be moved. Someone who booked does not arrive.
For each of these, write who does the work, with what information, and what “finished” looks like. You do not need technical terms. Written in your own words, this is much clearer for a programmer than a feature list.
If you want a short pattern for each scene, the same UK guidance roughly suggests: “I need to… so that…” and, if it helps, “As a… when…” The sentence should sound like something a real person would say, not like a sales catalogue.
A weak example and a better one
The difference is easy to see with the same hypothetical clinic. A weak version is roughly this: “I want an online booking system with payments, text messages and an admin panel, like the apps large clinics use.” From that sentence you cannot tell who makes the booking, how a change of time works, or what should happen if the patient does not arrive. Two honest teams can give two very different prices for two different jobs.
A better version might start like this: “A returning patient books by phone or through a simple link. The receptionist must be able to see, at that moment, whether the hour is free, record the appointment and tell the patient when to come. The patient or the receptionist must be able to move that same appointment. If the patient does not arrive, the appointment is marked as a no-show on today’s list. The first version will not include reminder texts or online payment.” It is still short, but a programmer can say what is being priced, and what is not.
For the first version, three to seven complete scenes are enough
The first version does not have to cover every hope for the next two years. Three to seven scenes that work from start to finish are usually a better start than thirty unfinished features. For that hypothetical clinic, the first version might be only this:
- A returning patient can book a slot the clinic actually has free at that time.
- The patient or the receptionist can move that same appointment.
- The receptionist can see today’s list and mark who came and who did not.
Until those three work in real use, leave the loyalty club, a separate patient app, a link to the accounting software and smart reminders out on purpose. They may be useful later. If they enter the price on day one, they change the figure and the timetable from the first meeting.
The same UK design principles say the best way to build a good service is to start small and then iterate. Starting small, the guidance says, reduces risk. For a small business, the simple meaning is that a version which reaches a real user sooner is easier to keep in bounds, and it shows you what people actually use.
Write the exceptions; those are what consume time
The happy path is usually clear in the owner’s mind: someone books and then arrives. What delays a project is often the unusual cases that were not mentioned in the first meeting.
In the same hypothetical example, write these too if they happen in your work: a patient does not arrive; two people want the last free hour at almost the same time; someone should not be booked with a particular therapist; the clinic is closed on a holiday; payment is after the session, not at booking; a phone booking and a booking from a link must not both be recorded for the same hour.
If these are not written down, the programmer will usually price the simple path. Each exception later comes back as a mid-project change and moves the cost and the timetable. Writing the exceptions does not mean building all of them in the first version. It means deciding which ones must work from day one, and which ones will wait on purpose.
What the first version will deliberately not do
Just as you say what the first version will finish, write what it will not do. That heading already appears in this site’s short brief template; the reason is simple. If “we’ll see later” never reaches the page, it usually enters the work anyway.
For the hypothetical clinic that might mean: the first version will not be a native app in the app stores, only a simple link; it will not connect to the accounting software; it will not include a customer club or automatic reminder texts. Once that is written, quotes stay comparable, and adding any of those items becomes a specific request with an effect on time and cost, not something that “was obviously included.”
A simple test before you ask for a quote
Give the page to someone who does not do your everyday work, or send it to two teams. If each of them understands something quite different, or their questions show they do not have the same system in mind, the writing is not yet good enough to price. It is time to rewrite, not to bargain over a number.
On the same page, briefly say who will use the software, and whether it must connect to tools you already have, such as a payment provider or accounting software. If you know a budget or a date that matters to you, say so — not so the other side treats that figure as a promise, but so the first version fits your reality. How to prepare for a first meeting, and what to ask before a contract, is in the ten-questions article. Once the material is written, you can arrange it in the “How do we write a software project brief?” template.
If you change your mind during the work
In almost every project, new ideas appear once you see the first version. That is natural. The problem is when there is no baseline to compare against. The written need is that baseline: a change is recorded, its effect on time and cost is estimated, and it goes ahead only after you agree. That process is in question nine of “10 questions to ask before you order an app or software,” and we do not open it again here.
Closing
Ordering software is less painful when the programmer understands your work, not only a list of features. Write a real day, name three to seven scenes for the first version, write down the exceptions and what you will deliberately not build, and only then ask for a quote. This does not replace the one-page brief template; it fills it.
At Behvandi Studio we build business software, sites and apps, and automation and AI tools. We start by asking how your work actually runs, we keep the first version small and clear, and we tell you the effect of a change before it is carried out. If you would like to go over your description of the need before you ask for a quote, we would be glad to hear from you through the “Contact us” page on the Behvandi site. Sometimes the honest answer is to start with a ready-made tool, or even with your current method, just a little more orderly; we say that too.
Sources
- McKinsey and the University of Oxford — Delivering large-scale IT projects on time, on budget, and on value, October 2012 (more than 5,400 IT projects with initial budgets above $15 million)
- UK Government — Government Design Principles: “Start with user needs” and “Iterate. Then iterate again,” updated 2 April 2025
- GOV.UK Service Manual — Learning about users and their needs: write the need around the user’s problem, not a pre-chosen solution
Comments
No comments yet. Be the first to write one.